calender
Date & Time
Search
Datum
{{range.dates[index].day}}
{{range.dates[index].date}}
Time
Mornings Noon Afternoons Evenings
  • from
  • to
  • o'clock
Topic
Event location
Event
Properties
{{item.name}}
{{item.name}}
Exhibition venue

(please choose the desired areas)

Lecture language
Format

Events calendar 2019

Information about forums, live demonstrations, Accelerating Talents and panel discussion. The entire forum program is available in the event database.

Back to the EventList

Why is everyone talking about scheduling their fabs?

NOV
13
2019
13. NOV 2019

Presentation Hall B1 SEMICON EUROPA > TechARENA 1 & 2 - Technological Platform for Innovation > Smart Manufacturing I (software-centric)

11:30-11:50 h | Hall B1 Tech Arena 1, Booth B1.175

Subjects: SEMICON EUROPA

Type: Presentation

Speech: English

The Industry 4.0/Smart Manufacturing revolution is underway and already driving changes throughout the Semi industry and world. The establishment of a comprehensive Digital Twin of a factory is key to delivering any I4.0/Smart solution. It is significantly more difficult to create a Digital Twin in Semi than any other industry for several reasons which will be reviewed. Fabs are willing to invest in creating a Digital Twin because it enables new capabilities, many of which were not comprehended even a few years ago. Among the new I4.0/Smart solutions, full Fab/Factory Scheduling is the leading application as it typically provides the fastest and greatest ROI. We will review the data and factory requirements, deliverables and expected benefits from such a system including case studies. We will conclude with an overview of future Scheduler enhancements including the integration with tool centric solutions like APC,FDC, eOCAP, etc..

Informations

John Behnke

Mr. Behnke has 35 years of semiconductor industry experience including: logic and memory manufacturing, technology/product development and fab operational excellence. As the GM of Final Phase Systems an INFICON Product Line, John leads a team that develop and deploy SMART software solutions that enable fabs to improve their manufacturing efficiency. FPS’s suite of software solutions are built upon a common Datawarehouse which enables advanced Fab Scheduling and optimized WIP movement as well as other related capabilities. He is also a Co-Chair of the Semi North America Smart Manufacturing Special Interest Group. Prior to FPS John served as the CEO and President of Novati Technologies, the SVP and GM of the Semiconductor Group of Intermolecular, the CVP for Front End Manufacturing, Process R&D and Technology Transfers at Spansion and the Director of AMD’s Fab 25’s Engineering and Operations groups where he was a founding member of AMD’s Automated Precision Manufacturing (APM) initiative which led the Semiconductor industry’s development and use of APC and other advanced factory systems. He also led the successful conversion of Fab 25 from Logic to Flash memory which was enabled through the virtual automation of the fab.Mr. Behnke earned a B.S. degree in Mechanical Engineering with an Industrial Engineering Minor from Marquette University. Mr. Behnke holds five U.S. patents.

John Behnke
General Manager Final Phase Systems

Location

Eingang
Nord-West
ICM
Eingang
Nord
Eingang
West
Atrium
Eingang
Nord-Ost
Eingang
Ost
Conference
Center Nord
Freigelände
C1
C2
C3
C4
C5
C6
B0
B1
B2
B3
B4
B5
B6
A1
A2
A3
A4
A5
A6

More Events